specsall articlesTue, 06 Oct 2026Plan: Durable execution from the CLI1013 words / 0 links / 0 images / 9 snippetsStatus: implemented. agents-exe session start and session step exist next Tue, 06 Oct 2026Specs264 words / 13 links / 0 images / 0 snippetsThe design documents under todos/, each headed by a Status line saying what of it has shipped. Tue, 06 Oct 2026Spec: the OS as a standalone server (TUI and web UI as clients)4083 words / 0 links / 0 images / 2 snippetsStatus: implemented. Phases 0 to 5 landed on 2026-09-23 and 2026-09-24 Tue, 06 Oct 2026Plan: Durable Workflows for agents-exe1151 words / 1 links / 0 images / 12 snippetsStatus: implemented, Phases 1 to 8 (2026-09-08), see Tue, 06 Oct 2026Async Tool Calls Implementation Progress3792 words / 0 links / 0 images / 1 snippetsStatus: all phases done (7850f2e); tracing for async calls was left out. Tue, 06 Oct 2026Web server embedding — Implementation Progress1809 words / 0 links / 0 images / 0 snippetsStatus: Phases 1 to 12 complete, and this log stops there. Phase 13 Tue, 06 Oct 2026Spec: embedding agents-exe in a web server6357 words / 5 links / 0 images / 12 snippetsStatus: implemented. Phases 1 to 13 and database agents with tools and Tue, 06 Oct 2026Asynchronous / Interruptible Tool Calls1602 words / 0 links / 0 images / 12 snippetsStatus: implemented (7850f2e), all phases; see Tue, 06 Oct 2026Spec: a salmon-driven preview deployment of agents-server1514 words / 1 links / 0 images / 1 snippetsStatus: proposal, 2026-10-03. Nothing implemented. A design pass with a Tue, 06 Oct 2026Durable Workflows — Implementation Progress2658 words / 0 links / 0 images / 0 snippetsStatus: Phases 1 to 8 and the how-to addendum complete (2026-09-08). A log: Tue, 06 Oct 2026Spec: partial application of tool arguments6804 words / 1 links / 0 images / 18 snippetsStatus: implemented. Phases 1-7 and §8.4 (derive_agent) done as of 2026-09-21 Tue, 06 Oct 2026Spec: the session mailbox (agent-to-agent mail, suspended tool calls, interrupts, tool-call wrappers)2758 words / 0 links / 0 images / 9 snippetsStatus: implemented. Phases 0 to 6 landed on 2026-09-22 in PR #570 Tue, 06 Oct 2026Spec: bash tools v2, long-running tool processes2728 words / 0 links / 0 images / 4 snippetsStatus: proposal, 2026-09-25, from issue #539 and a robot-chat conversation other topicsdocs28how-to3reference1